Blob Blame History Raw
From 4d00fc477a2ce8b6d2b09fb34ef9fe9918e7d434 Mon Sep 17 00:00:00 2001
From: "Steven Rostedt (VMware)" <rostedt@goodmis.org>
Date: Mon, 9 Mar 2020 16:00:11 -0400
Subject: [PATCH] ktest: Add timeout for ssh sync testing
Git-commit: 4d00fc477a2ce8b6d2b09fb34ef9fe9918e7d434
Patch-mainline: v5.6-rc6
References: git-fixes

Before rebooting the box, a "ssh sync" is called to the test machine to see
if it is alive or not. But if the test machine is in a partial state, that
ssh may never actually finish, and the ktest test hangs.

Add a 10 second timeout to the sync test, which will fail after 10 seconds
and then cause the test to reboot the test machine.

Cc: stable@vger.kernel.org
Fixes: 6474ace999edd ("ktest.pl: Powercycle the box on reboot if no connection can be made")
Signed-off-by: Steven Rostedt (VMware) <rostedt@goodmis.org>
Acked-by: Takashi Iwai <tiwai@suse.de>

---
 tools/testing/ktest/ktest.pl | 2 +-
 1 file changed, 1 insertion(+), 1 deletion(-)

diff --git a/tools/testing/ktest/ktest.pl b/tools/testing/ktest/ktest.pl
index 6a605ba75dd6..8bdd7253c110 100755
--- a/tools/testing/ktest/ktest.pl
+++ b/tools/testing/ktest/ktest.pl
@@ -1383,7 +1383,7 @@ sub reboot {
 
     } else {
 	# Make sure everything has been written to disk
-	run_ssh("sync");
+	run_ssh("sync", 10);
 
 	if (defined($time)) {
 	    start_monitor;
-- 
2.16.4