From: stephen hemminger <stephen@networkplumber.org>
Date: Wed, 19 Jul 2017 11:53:14 -0700
Patch-mainline: v4.14-rc1
Subject: netvsc: change order of steps in setting queues
Git-commit: a5e1ec3833211bc0136649a89ee3a29355c7b43b
References: fate#323887
This fixes the error unwind logic for incorrect number of queues.
If netif_set_real_num_XX_queues failed then rndis_filter_device_add
would have been called twice. Since input arguments are already
ranged checked this is a hypothetical only problem, not possible
in actual code.
Signed-off-by: Stephen Hemminger <sthemmin@microsoft.com>
Signed-off-by: David S. Miller <davem@davemloft.net>
Acked-by: Olaf Hering <ohering@suse.de>
---
drivers/net/hyperv/netvsc_drv.c | 8 +++-----
1 file changed, 3 insertions(+), 5 deletions(-)
diff --git a/drivers/net/hyperv/netvsc_drv.c b/drivers/net/hyperv/netvsc_drv.c
--- a/drivers/net/hyperv/netvsc_drv.c
+++ b/drivers/net/hyperv/netvsc_drv.c
@@ -724,17 +724,15 @@ static int netvsc_set_queues(struct net_device *net, struct hv_device *dev,
device_info.ring_size = ring_size;
device_info.max_num_vrss_chns = num_chn;
- ret = rndis_filter_device_add(dev, &device_info);
- if (ret)
- return ret;
-
ret = netif_set_real_num_tx_queues(net, num_chn);
if (ret)
return ret;
ret = netif_set_real_num_rx_queues(net, num_chn);
+ if (ret)
+ return ret;
- return ret;
+ return rndis_filter_device_add(dev, &device_info);
}
static int netvsc_set_channels(struct net_device *net,