Blob Blame History Raw
From: Yonglong Liu <liuyonglong@huawei.com>
Date: Fri, 31 May 2019 16:59:50 +0800
Subject: net: hns: Fix loopback test failed at copper ports
Patch-mainline: v5.2-rc4
Git-commit: 2e1f164861e500f4e068a9d909bbd3fcc7841483
References: bsc#1140676

When doing a loopback test at copper ports, the serdes loopback
and the phy loopback will fail, because of the adjust link had
not finished, and phy not ready.

Adds sleep between adjust link and test process to fix it.

Signed-off-by: Yonglong Liu <liuyonglong@huawei.com>
Signed-off-by: David S. Miller <davem@davemloft.net>
Acked-by: Thomas Bogendoerfer <tbogendoerfer@suse.de>
---
 drivers/net/ethernet/hisilicon/hns/hns_ethtool.c |    4 ++++
 1 file changed, 4 insertions(+)

--- a/drivers/net/ethernet/hisilicon/hns/hns_ethtool.c
+++ b/drivers/net/ethernet/hisilicon/hns/hns_ethtool.c
@@ -339,6 +339,7 @@ static int __lb_setup(struct net_device
 static int __lb_up(struct net_device *ndev,
 		   enum hnae_loop loop_mode)
 {
+#define NIC_LB_TEST_WAIT_PHY_LINK_TIME 300
 	struct hns_nic_priv *priv = netdev_priv(ndev);
 	struct hnae_handle *h = priv->ae_handle;
 	int speed, duplex;
@@ -365,6 +366,9 @@ static int __lb_up(struct net_device *nd
 
 	h->dev->ops->adjust_link(h, speed, duplex);
 
+	/* wait adjust link done and phy ready */
+	msleep(NIC_LB_TEST_WAIT_PHY_LINK_TIME);
+
 	return 0;
 }